home *** CD-ROM | disk | FTP | other *** search
/ Developer Source 5 / developer source - volume 5.iso / exepc / jul96 / pickf104.gif < prev    next >
Graphics Interchange Format  |  1997-01-16  |  10.0 KB  |  279x271  |  4-bit (16 colors)
   ocr: - Apoor astimate but the smali triangle E1 means welghting Is low Agood estimate and the large triangle E2 means weighting is high 2 Figure4-? - The furthest-apart and best spaced triples ofpoints will provide, good estimates ofthe centre's location.